Event Party Club Lights 200W LED COB Par Can with Zoom
AMD9067 200w led cob par zoom stage light is equipped with a high brightness warm white or cool white 200W LED.
with a 6°--45° motorized zoom angle.
Perfect for stage, studio, theater, church use
Specifications:
Model |
AMD9067 |
Voltage |
AC100V-240V 50/60HZ |
Power Supply |
300W |
Light Source |
200W warm white or cool white led(can make 100w,150w,300W) |
Color temperature |
3200k/5600k for choice |
Zoon Angle |
6-45° |
Control Channel |
5 channels. |
Control Mode |
DMX512/Master-slave, sound activated, auto run, manual |
Dimmer |
0-100% linear dimming |
Strobe |
inside various speed strobe effect |
Display |
digital display |
IP Rating |
IP20 |
structure |
high strength aluminum +large heat sink+super silent cooling fan |
Work temperature |
-20-45° |
Power Connector |
PowerCon in and out |
Application |
outdoor performance,middle and large performance, wedding,theatre,hall, studio etc |
Warranty:
a) We have One year warranty for our products.
b) For damage on arrival, please claim to the shipping company firstly and get the claim number and inform us,also take the photos on the damage and send to us for verifying, we will help you to claim to the shipping company to get the compensation.
c) If there is the problem with the product, firstly you need send the pictures or the video to us, let us make surewhat's problem about the product. If the problem can use the parts to solve,
we will offer you the replacement for free during warranty time.
FAQ:
Q:Are you a factory or trade company?
A:We are a professional stage lighting factory.
Q:Do you accept OEM or ODM?
A:We accept OEM but not for ODM now.
Q:What's the delivery time?
A:Usually,it costs about 3 to 7 days for sample and more time for bulk order.Eg,as for a 20 cabniet,we need about 20 days to prepare well.
Q:What's the payment term?
A:We accept T/T,western union and paypal.
Q:Are the products of good quality?How can you ensure it?
A:Yes,the quality is good.We have strict test before shipping.We have test for semi-manufactured products about 3 days and 2 days for end products